Inspection Status: Approved
Inspection History: BUILDING ABOVE CEILING
| Date |
Description |
Inspector |
Results |
Comments |
| 09/11/2003 |
BUILDING ABOVE CEILING |
|
Approved |
IVRS - Inspection 0000* |
| 09/10/2003 |
BUILDING ABOVE CEILING |
|
Denied |
IVRS - Inspection 0999* ASTM REQUIRES 3 TIGHT TURNS OF HANGER WIRE WITHIN 3" OF LOOP |
| 09/03/2003 |
BUILDING ABOVE CEILING |
|
Not ready for Inspection |
IVRS - Inspection 0000* FINISH ACCOUTIS CEILING GRID. DO NOT INSTALL TILE UNTIL INSPEC COMPLETE |
| 08/25/2003 |
BUILDING ABOVE CEILING |
|
Not ready for Inspection |
IVRS - Inspection 0000* 10 MONOKOTE REPAIR MUST COVER ENTIRE AREA REMOVED FOR FRAMING THAT INCLUDES INSIDE TRACKS. 2) CALL FOR ABOVE CEILING AFTER ACCOUSTIC CEILING GRID IS INSTALLED |