Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 09/19/2003 |
PLUMBING - FINAL |
|
Approved |
IVRS - Inspection 0000* 1) ALL CORRECTIONS MADE |
| 09/18/2003 |
PLUMBING - FINAL |
|
Not ready for Inspection |
IVRS - Inspection 0000* |
| 09/18/2003 |
PLUMBING - FINAL |
|
Denied |
IVRS - Inspection 0999*/ PLEASE REMOVE SANTEE ON VENT. 2) PLEASE CORRECT DRAIN FOR T&P HOT WATER HEATER TO DRAIN PROPERLY. 3) PLEASE PROVIDE CORRECT SIDEWALL CLEARANCE FOR H/C STOOLS. |
| 09/17/2003 |
PLUMBING - FINAL |
|
Denied |
IVRS - Inspection 0999*/1) MUST REMOVE SAN TEE IN CEILING AT VENT FOR FLOOR SINK. 2) MUST USE A DIRECTIONAL FITTING NOT A SAN TEE FOR CONTINUOUS WASTE AT 3-COMPT SINK. 3) MUST SECURE INDIRECT WASTE LINE AT 3 - COMPT PEEP SINK. 4) MUST PROVIDE 90 DEGREE FOR T&P DRAIN AND PAN DRAIN. 5) ONE WATER CLOSET DOES NOT MEET ADA SIDE WALL CLEARANCE. 6) MUST HAVE BACKFLOW PREVENTORS TESTED AND CERT. 7) CONNECT DRAIN FOR BACKFLOW 009. |