Inspection Status: Approved
Inspection History: ELECTRIC - INTERMEDIATE
| Date |
Description |
Inspector |
Results |
Comments |
| 09/05/2003 |
ELECTRIC - INTERMEDIATE |
|
Approved |
|
| 07/31/2003 |
ELECTRIC - INTERMEDIATE |
|
Denied |
IVRS - Inspection 0245*/ 1) ELECTRICAL CONTRACTOR REFUSED TO COMPLY WITH NEC ART.300 AND 310 REGARDING BUNDLING OF MC CABLES. REFEE ASSESSED (REMOVED REFEE PER SLONG ON 8/5/03) |
| 07/30/2003 |
ELECTRIC - INTERMEDIATE |
|
Denied |
IVRS - Inspection 0245$/ SEE NOTES BELOW: 1) DO NOT BUNDLE CABLES-IF BUNDLED YOU MUST SUBMIT DERATING FACTORS AND CALCULATIONS AND RESIZE CABLE ACCORDINGLY 2) DO NOT USE NYLON TY-RAPS TO BUNDLE OR SUPPORT CABLE. THESE ARE NOT APPROVED BY CODE OR MANUFACTURER 3) BE SURE YOUR CIRCUITS ARE INSTALLED PER PLAN |
| 07/21/2003 |
ELECTRIC - INTERMEDIATE |
|
Partial Approval |
IVRS - Inspection 0000*/ PVC UNDERSLAB, THANKS. BE SURE YOU HAVE ENOUGH CODUITS FOR THE NUMBER OF CIRCUITS TO BE COMBINED IN THE RUN. THANKS. |