Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
Permit Number - T03CM02662
Inspection Description - ELECTRIC - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
12/01/2003 | ELECTRIC - FINAL | Approved | IVRS - Inspection 0000* | |
11/22/2003 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection 0000*/ 1) OK CONNECTIONS TO OLD DISTRIBUTION CENTER 2) OK 4-4" PVC INTO TEP TRANSFORMER 3) OK TRANSFER SWITCH TO ENERGIZE GENERATOR 4) OK CONNECTIONS TO SES FROM TRANSFORMER 5) RECEIVED CHECK #3646 FOR AFTER HOURS INSPECTION | |
11/21/2003 | ELECTRIC - FINAL | Not ready for Inspection | IVRS - Inspection 0000* | |
11/20/2003 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection 0000*/ 1) BONDING JUMPERS TO BE SIZED PER 250.102 AND TABLE 250.122 ON LOAD SIDE 2) A SIGN FOR STAND BY EQUIPMENT AS PER 702.8 3) PLEASE PROVIDE LETTER FOR GFI TESTING PER 230.95 4) MEETING WITH CONTRACTOR TO PREPARE FOR AFTER HOURS INSPECTIONS ON 11/22/03 5) MAINTAIN WORKING CLEARANCES PER 110.26 |