Permit: T03CM02608

Parcel: 11306107A

Inspection Status: Approved

Inspection History: EXT METAL CLIPS/EXT SHEATHING

Date Description Inspector Results Comments
08/28/2003 EXT METAL CLIPS/EXT SHEATHING Approved IVRS - Inspection 0000*
08/26/2003 EXT METAL CLIPS/EXT SHEATHING Denied IVRS - Inspection 0999* LOAD PATH NAILING IS NOT COMPLETE. PLYWOOD NAILING IN LEIU OF HURRICANE TIES DOES NOT EXSIST. 2) FHA 24 STRAPS MUST BE CONNECTED FROM ALL 4 2 X 8 PLATES TO 6 X 6 BEAM @ ALL RAFTERS TAILS.3) THESE NOTES WERE NOT PART OF LAST INSP BECAUSE THEY REFER TO REVISION DATED 8/25/03
08/22/2003 EXT METAL CLIPS/EXT SHEATHING Denied IVRS - Inspection 0999* 1) UNABLE TO CONFIRM A35 CLIPS ON EAST LEDGER. 2) SHEAR WALL REQUIRES 6" O.C. NAILING ON ALL EDGES.
08/18/2003 EXT METAL CLIPS/EXT SHEATHING Not ready for Inspection IVRS - Inspection 0000* CORRECTION NOT MADE
08/15/2003 EXT METAL CLIPS/EXT SHEATHING Denied IVRS - Inspection 0999* 1) SHEAR WALLS ARE TYPICALLY BLOCKED AT ALL EDGES. PROVIDE R F I FROPM ENG, DETAILING BLOCKING OR INSTALL & NAIL BLOCKING.