Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
| Date |
Description |
Inspector |
Results |
Comments |
| 07/09/2003 |
PLUMBING - INTERMEDIATE |
|
Approved |
IVRS - Inspection 0000* |
| 07/07/2003 |
PLUMBING - INTERMEDIATE |
|
Denied |
1) USE A ONG SWEEP 1/4 BEND VERTICAL TO HORIZ. LAUNDRY DRAIN. 2) FLAT VENT FOR W/CLOSET ROLL WYE FITTING UP ABOVE CENTER LINE 3) USE TAPPERED REDUCER FITTING 2" TO 3" ( NOT A BUSHING) 4) CANNOT USE A SANITARY TEE LYING FLAT FOR DRAINAGE 5) 2" TRAP ARM FOR LAV TO BE SAME SIZE AS TRAP 6) MAKE SURE YOU HAVE A 30" COMPARTMENT FOR TOILET 7) PROTECT ALL PIPING FROM SHEET ROCK NAILING 8) SECURE H20 LINE FOR TOILET 9) WHY ARE YOU SO FAR AWAY FROM WALL WITH CLOSET FLANGE? 18 1/2" FROM WALL. 10) NEED CLEAN OUT FOR LAUDRY DRAIN 11) HOW DEEP WAS THE HCS, YOU ARE ALMOST ON GRADE AT SEWER EXITING THE BUILDING. 12) FIND UPSTREAM MAN HOLE, YOU NEED A BACK H20 VALVE. |