Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
Permit Number - T03CM02453
Inspection Description - PLUMBING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/30/2003 | PLUMBING - FINAL | Approved | IVRS - Inspection 0000*/ 1) CORRECTIONS MADE-OK 2) PLUMBING FINAL-OK 3) OK FOR C OF O PENDING ANY OTHER INSPECTION | |
06/09/2003 | PLUMBING - FINAL | Denied | IVRS - Inspection 0999* | |
06/04/2003 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection 0000*/ 1) WORK COVERED WITHOUT INSPECTION 2) PLAN DOES NOT MATCH WORK 3) EXISTING BATHROOM HAS BEEN REMOVED AND COVERED WITHOUT INSPECTION 4) SEE LAST 2 INSPECTIONS | |
06/03/2003 | PLUMBING - FINAL | Denied | IVRS - Inspection 0999* 1) NO CHANGE FROM LAST INSPECTION 2) YOU DO NOT HAVE PERMISSION TO OCCUPY. YOU DO NOT HAVE A C OF O | |
06/01/2003 | PLUMBING - FINAL | Denied | IVRS - Inspection 0999*/ 1) PLAN SHOWS DEMOLITION OF WATER CLOSET AND LAVATORY AND ROUGH IN FOR A SINK 2) WORK COMPLETED WHEN INSPECTOR ARRIVED 3) CONTRACTOR CLAIMS THE SINK WAS EXISITING AND NO INSPECTION PERFORMED BECAUSE ALL WORK IS COVERED |