Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit: T03CM02449

Parcel: 113061320


Addresses:

3255 N CAMPBELL AV


Inspection Status: Approved

Inspection History: PLUMBING - FINAL

Permit Number - T03CM02449

Inspection Description - PLUMBING - FINAL

Inspection Status - Approved

Date Description Inspector Results Comments
07/09/2009 PLUMBING - FINAL Approved These were all provided and documented. Inspections were ok.
09/16/2003 PLUMBING - FINAL Not ready for Inspection IVRS - Inspection 0000*/ SORRY I AM UNABLE TO FINAL THIS BLDG. PLEASE PROVIDE PERMITS AND REQUIRED INSPECTIONS AS REQUIRED BY THE CODE IN CONJUNCTION WITH A.C.C.
09/12/2003 PLUMBING - FINAL Not ready for Inspection IVRS - Inspection 0000*/ 1) NOBODY AROUND OFFICE LOCKED 2) PLEASE READ OVER INSPECTION REQUEST AS OF 8/12/03 3) YOU ARE REQUIRED TO PROVIDE A PERMIT AND APPROVED DRAWING ON GAS LINE WITH TOTAL LENGHT AND TOTAL BTU'S. A TEST WILL BE REQUIRED. THIS REGUALTION IS COVERED IN CHAPTER 12 94 UPC AND IN CONJUCTION WITH ARIZONA CORPORATION COMISSION REGULATIONS
09/09/2003 PLUMBING - FINAL Denied IVRS - Inspection 0999*/ 1) A CONDENSATE DRAIN MAY NOT BE VALVED
09/03/2003 PLUMBING - FINAL Denied IVRS - Inspection 0999*/ 1) ALL GAS PIPING, VALVES AND APPERTANOMIES HAVE BEEN INSPECTED BY OTHERS. I WOULD QUESTION THE USE OF AND LENGTH OF GAS FLEXES ON ROOF TOP UNITS 2) CONDENSATE PIPING NOT INSTALLED PER PLAN. REDUCING THE SIZE OF THE DRAIN IS NOT PERMITTED. CONDENSATE DRAINS TO BE FULL SIZE ALL THE WAY TO THE LAVATORY TAIL PIECE
08/12/2003 PLUMBING - FINAL Denied IVRS - Inspection 0999*/ 1) NO GAS ON PERMIT. 2) REQUIRE GAS ISOMETRIC WITH DEVELOPED LENGTH AND TOTAL BTU CONSUMPTION STAMPED BY CITY.