Inspection Status: Partial Approval
Inspection History: ELECTRIC - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 11/14/2003 |
ELECTRIC - FINAL |
|
Partial Approval |
IVRS - Inspection 0000* ROOMS 258, 259, 261, 262 AN INST HOT IN BREAKROOM |
| 11/12/2003 |
ELECTRIC - FINAL |
|
Partial Approval |
IVRS - Inspection 0000* 1) FINISH SUPPORTING VDV CABLES UP OFF GRID. 2) FINISH ITEM #3 OF INSP 10/27/03 |
| 10/27/2003 |
ELECTRIC - FINAL |
|
Partial Approval |
IVRS - Inspection 0000* |
| 10/07/2003 |
ELECTRIC - FINAL |
|
Partial Approval |
IVRS - Inspection 0000*/ 1) INSTALL HOT WATER HEATER IS A 3KW-120V UNIT-THIS REQUIRES A 25 AMP CIRCUIT. UNIT IS NOT LISTED FOR CORD CONNECTION. PLEASE PRVOIDE A DISCONNECTING MEANS |
| 08/27/2003 |
ELECTRIC - FINAL |
|
Partial Approval |
IVRS - Inspection 0000*/ 1) BOND BUSHING NEEDED AT CONCENTRIC OVER 250V 250-97 2) WE HAVE MULTIPLE TERMANATIONS AT LINE TERMANEL-LIEBERT UNIT 3) OK PHASE I AND II AS NOTED |