Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - YARD WTR LINE/TEST
Permit Number - T03CM02424
Inspection Description - PLUMBING - YARD WTR LINE/TEST
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/19/2004 | PLUMBING - YARD WTR LINE/TEST | Approved | IVRS - Inspection :*/INSPECTED 3/25/04 & 10/5/04 LETTER FROM ENGINEER TURNED IN | |
10/05/2004 | PLUMBING - YARD WTR LINE/TEST | Partial Approval | 1) 2-2" TYPE L WATER LINES WITH RP'S AT EAST PROPERTY LINE 2) 1-2" TYPE L WITH R/P TO GATE HOUSE. LINES UNDER WORKING PRESSURE THRU R/P THE 80# AIR | |
05/14/2004 | PLUMBING - YARD WTR LINE/TEST | Partial Approval | IVRS - Inspection :*/ 80 PSI AIR TEST ON 4" C900 TO 4" SCH 40 PVC TIE-IN TO BLD ON SOUTHWEST CORNER FOR H20. 1) NEED TO SEE METER THRU BACKFLOW DEVICES TIE-IN ON OPPISITE END. 2) NEED STAMPED LETTER FROM ENGINEER STATING C900 TO SCH40 PVC TO COPPER IS OK IN LIEU OF SPEC FOR DUCTILE IRON SERVICE PIPING. | |
05/06/2004 | PLUMBING - YARD WTR LINE/TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999*/ 1) MUST PROVIDE APPROVED TRANSITION FROM C-900 TO SCH. 40 AS PER SPECS 2) MUST HAVE MINIMUM 18" OF METALIC PIPING FOR GAS TRANSITION RISER |
|
03/25/2004 | PLUMBING - YARD WTR LINE/TEST | Partial Approval | IVRS - Inspection 0000*/ 4" C 900 FROM CURB AREA TO 5' FROM SOUTHWEST CORNER OF BLD. 150 PSI HYDRO TEST PARTIAL APPROVAL PENDING SEEING CITY APPROVED DRAWINGS AND CHECK OF SPEC'S AND PROPER CLEARANCE OF WTR UNDER SDR STORM DRAINAGE. |