Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit: T03CM02424

Parcel: 128102930

Inspection Status: Approved

Inspection History: PLUMBING - YARD WTR LINE/TEST

Permit Number - T03CM02424

Inspection Description - PLUMBING - YARD WTR LINE/TEST

Inspection Status - Approved

Date Description Inspector Results Comments
10/19/2004 PLUMBING - YARD WTR LINE/TEST Approved IVRS - Inspection :*/INSPECTED 3/25/04 & 10/5/04 LETTER FROM ENGINEER TURNED IN
10/05/2004 PLUMBING - YARD WTR LINE/TEST Partial Approval 1) 2-2" TYPE L WATER LINES WITH RP'S AT EAST PROPERTY LINE 2) 1-2" TYPE L WITH R/P TO GATE HOUSE. LINES UNDER WORKING PRESSURE THRU R/P THE 80# AIR
05/14/2004 PLUMBING - YARD WTR LINE/TEST Partial Approval IVRS - Inspection :*/ 80 PSI AIR TEST ON 4" C900 TO 4" SCH 40 PVC TIE-IN TO BLD ON SOUTHWEST CORNER FOR H20. 1) NEED TO SEE METER THRU BACKFLOW DEVICES TIE-IN ON OPPISITE END. 2) NEED STAMPED LETTER FROM ENGINEER STATING C900 TO SCH40 PVC TO COPPER IS OK IN LIEU OF SPEC FOR DUCTILE IRON SERVICE PIPING.
05/06/2004 PLUMBING - YARD WTR LINE/TEST Denied IVRS - Inspection :
See detailed listing on site.| 999*/ 1) MUST PROVIDE APPROVED TRANSITION FROM C-900 TO SCH. 40 AS PER SPECS 2) MUST HAVE MINIMUM 18" OF METALIC PIPING FOR GAS TRANSITION RISER
03/25/2004 PLUMBING - YARD WTR LINE/TEST Partial Approval IVRS - Inspection 0000*/ 4" C 900 FROM CURB AREA TO 5' FROM SOUTHWEST CORNER OF BLD. 150 PSI HYDRO TEST PARTIAL APPROVAL PENDING SEEING CITY APPROVED DRAWINGS AND CHECK OF SPEC'S AND PROPER CLEARANCE OF WTR UNDER SDR STORM DRAINAGE.