Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
Permit Number - T03CM02424
Inspection Description - PLUMBING - INTERMEDIATE
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/05/2004 | PLUMBING - INTERMEDIATE | Approved | IVRS - Inspection :*/CORRECTIONS MADE | |
11/02/2004 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* | |
10/22/2004 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :*/ 1) 1ST AND 2ND FLOOR ROOMS FIXTURES OK EXCEPT HANDICAP UNITS AND LAUNDRY AND WATER HEATER ROOMS | |
10/19/2004 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :*/INSTALL WATER HEATER PIPING PER APPROVED PLAN | |
09/29/2004 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :*/60 PSI AIR TEST ON ALL H2O PIPING IN BUILDING EXCEPT WATER HEATER ROOM TO BUILDING SERVICE ENTRANCE OK. 4TH FLOOR ATTIC HOT WATER RETURN PIPING AIR TEST OK. 1)NEED OK FROM ENGINEER FOR BALL VALVES USED AS BALANCING VALVES ON HOT RETURN SYSTEM. PLEASE READ & FOLLOW SPEC ON INSULATTION OR PROVIDE LETTER FROM ENGINEER FOR YOUR INSTALLATON. | |
09/28/2004 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :*/60 PSI AIR TEST ON 1ST FLOOR MAINS BOTH HOT & COLD OK EXCEPT AT EAST SIDE HALL WAY JUNCTION WITH NORTH-SOUTH COORIDOR COLD TO BE 2 1/2" PER PLAN TO ROOM 135 | |
09/20/2004 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :*/ 1) WASTE AND VENT ISOMETRIC REVISED AND APPROVED AND ON SITE | |
09/13/2004 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* NOT READY | |
09/08/2004 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :*/60 ASI AIR TEST ON H20 PIPING IN LAUNDRY ROOM 2ND & 3RD FLOORS OK | |
08/30/2004 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :*/ 1) 70 PSI AIR TEST IN WALL ONY 4TH FLOOR WATER PIPING FROM ELEVATOR WEST TO END OF BLDG OK PENDING 2) CITY APPROVED H20 ISOMETRIC (REVISED) 3)LETTER FROM ARCH OR ENGINEER DELETING SHOCK STOPS ON 4TH FLOOR 4) LETTER FROM ARCH OR ENGINEER DELETING HOT AND COLD INSULATIONPER PLAN OR INSTALL INSULATION 5) COMPLETION OF OVERHEAD 4TH FLOOR H20 PIPING | |
08/25/2004 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :*/PARTIAL 1) 4TH FLOOR CLOSET FLANGES OK 2) 1ST FLOOR CLOSET FLANGES OK 3)H2O PIPING 20 PSI AIR TEST FROM ON ST? TO ELEVATOR FOR IN WALL ONLY OF UNITS OK 4) PENDING CORTOR?DELIGHTING? SHOCKS STOPS AND COMPLETION OF OVERHEAD PIPING FOR HOT RETURN SYSTEM. PROVIDE IN WRITTING FROM ARCH. OR ENGINEER PORTION OF HOT & COLD INSULATION PER PLAN OR INSTALL IT |
|
08/24/2004 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :*/ 1) CLOSET FLANGE IN ROOM 129 AND 130 OK | |
08/17/2004 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :*/PARTIAL APPROVED-3" ROTIN? DRAIN ON SOUTH CORNER ENTRANCE AREA AATER TEST PER ARCH. DIRECTIVE OK 1 14/2 HOT WATER ROTURN? FROM 4TH FLOOR TO 1ST FLOOR WATER HEATER ROOM COILING 70PSI AIR TEST. |
|
08/12/2004 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :WATER TEST THRU ROOK OK EXCEPT UNITS #317 & 412 ALL TUBS WATER TEST OK WATER PIPING AIR TEST OK TO 3RD FLOOR EXCEPT 3RD FLOOR LAUNDRY COVER 3RD FLOOR DRYWALL AT OWN RISK NEED REVISED WATER AND WASTE VENT ISOMETRICS 15 PSI AIR TEST TO FIREPLACES 3/4" RISERS 4 LOCATIONS FROM 1ST FLOOR TO 3RD FLOOR NO ROCK ON 3RD FLOOR UNTIL NEXT TEST |
|
08/10/2004 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :*/ 1) CLOSET FLANGES 2ND AND 3RD FLOORS OK 2) 70 PSI AIR TEST ON UNITS ONLY 3RD FLOOR WATER PIPING OK. EXCEPT UNITS 306,308,317, 323, 329 AND 3RD FLOOR LAUNDRY 2) WATER TEST TUB 308 | |
08/09/2004 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :*/ 1) ROOM #208 TUB WATER TEST OK. ALL TUBS EXCEPT ROOM 308 WATER TEST OK. WASTE AND VENT WATER TEST ON 3RD FLOOR OK EXCEPT NEED TO SEE ALL PIPING PROTECTED, FIRE CAULED AND SECURED PROPERLY 2) NEED CITY APPROVED ISOMETRIC OF YOUR LAV VENT SYSTEM 1ST THRU ROOF. NEED CITY APPROVED ISOMETRIC OF WASTE AND VENT SYSTEM 1ST THRU ROOF ON UNITS LIKE 334 AND 336 3) SECURE OVERHEAD VENT IN LAUNDRY ROOM 320 4) REPAIR VENT IN ROOM 334 KITCHEN OVERHEAD FROM 2ND FLOOR 5) REPAIR VENT IN ROOM 435 COUPLING KITCHEN SINK OVERHEAD 6) REPAIR RE-VENT IN ROOM 434 AT 90 DEGREE KITCHEN SINK 7) USE APPROVED VENT FITTINGS FOR 4" VENT? ROOF (NO 2-WAY CLEANOUTS) | |
08/04/2004 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :80 PSI AIR TEST ON WATER PIPING IN WALLS OF ROOMS ONLY FROM ELEVATOR WEST 2ND FLOOR OK EXCEPT LAUNDRY 2ND FLOOR REQUIRES TEST BACK TO BACK UNITS REQUIRE CITY APPROVED WATER ISOMETRICS SHOWING 1" CW & 3/4" HOT UP TO 2ND & 3RD FLOORS COVER WORK AT OWN RISK |
|
08/02/2004 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* | |
07/26/2004 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :WASTE AND VENT WATER TEST 2ND FLOOR ALL EXCEPT UNITS 201,202,203,204 OK WATER PIPING FROM EAST AND IN UNITS ONLY 2ND FLOOR UP TP ELEVATOR OK NEED TO SEE TUBS IN 208 & 308 | |
07/22/2004 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* | |
07/19/2004 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :*/ 1) 80 PSI AIR TEST ON H20 PIPING IN UNITS 102, 104, 106 AND 108 OK 1ST FLOOR 2) 03050 15 PSI AIR TEST FROM REGULATOR LOCATION OUTSIDE UNIT #125 TO 2ND FLOOR OK 3) 15 PSI AIR TEST FROM REGULATOR LOCATION OUTSIDE UNIT #108 UP TO 2ND FLOOR OK 4) PROVIDE IN WRITING OK FROM ENGINEER OR ARCHITECT FOR PROGRESS FITTINGS ON COPPER H20 PIPING SYSTEM | |
07/16/2004 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :*/ 1) 1ST FLOOR H2O PIPING IN UNITS ONLY. 80 PSI AIR TEST ALL UNITS EXCEPT #102, 104, 106 AND 108 2) PRESLAB FOR POOL EQUIPMENT ROOM PIPE WRAPS OK, EXCEPT GAS CANNOT BE UNDER CONCRETE | |
07/08/2004 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :*/ 1) WASTE AND VENT WATER TEST 1ST FLOOR OK TUBS 1ST, 2ND AND 3RD FLOOR EXCEPT UNITS #208 AND 326 WATER TEST OK 2) H20 PIPING 70 PSI AIR TEST IN ROOMS ONLY EAST END GOING WEST TO ELEVATOR OK | |
07/07/2004 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :*/ 1) WATER TEST TO BE 10' HEAD 2) 1ST 134-1 1/2 LAV VENT. 124-OVERFLOW AT TLB 3) 234 2ND FLOOR SOUTH EAST CORNER. 2ND FLOOR 2" TRAP ARM | |
07/02/2004 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* | |
06/04/2004 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :*/ INSTALL PER APPROVED ISOMETRIC OR PROVIDE CITY APPROVED ISOMETRIC OF YOUR INSTALLATION. |