| 10/19/2004 |
PLUMBING - ROUGH, SOIL |
|
Approved |
IVRS - Inspection :*/INSPECTED AS PARTIALS |
| 09/14/2004 |
PLUMBING - ROUGH, SOIL |
|
Partial Approval |
IVRS - Inspection :*/GREASE TRAP AT GATE HOUSE PIPING WATER TEST OK |
| 04/26/2004 |
PLUMBING - ROUGH, SOIL |
|
Partial Approval |
IVRS - Inspection :*/ HCS CONNECTION 8" PVC THRU BLD 2-WAY C.O. TO POINT OF CONNECTION BLD SEWER HCS OK. |
| 04/21/2004 |
PLUMBING - ROUGH, SOIL |
|
Partial Approval |
IVRS - Inspection 0000*/ 5 PSI AIR TEST FROM PLAN INITIAL ON 4/19/04 TO NORTHWEST END OF BLD UNDERGROUND ROUGH SOIL ON P1.0 INTERIOR BLD ONLY PLAN INITIAL 4/21/04 OK. OK ON PRE-SLAB WRAP. 4" T/K H2O STUB INTO BLD TO SOUTHWEST EXTERIOR 100 PSI AIR TEST OK. |
| 04/19/2004 |
PLUMBING - ROUGH, SOIL |
|
Partial Approval |
IVRS - Inspection 0000*/ 5 PSI AIR TEST OK FROM EAST TO WEST AND NORTH TO INCLUDE ROOM 105 AND 106 WHERE INITIALED ON AS BUILT DRAWING ON THIS DATE. |
| 04/15/2004 |
PLUMBING - ROUGH, SOIL |
|
Partial Approval |
IVRS - Inspection 0000*/ 5 PSI AIR TEST THRU INITIALED PLAN ON SITE FROM EAST TO THAT POINT OK. |
| 04/14/2004 |
PLUMBING - ROUGH, SOIL |
|
Partial Approval |
IVRS - Inspection 0000*/ AIR TEST TO ELEVATOR 1 AND 2 PER INITIAL ON PLAN. PRE-SLAB OK TO ELEVATOR H-2 PER INITIAL THIS DATE 4/14/04 |
| 04/09/2004 |
PLUMBING - ROUGH, SOIL |
|
Partial Approval |
IVRS - Inspection 0000*/ AIR TEST FROM EAST WORKING WEST ALL BLD EAST TO ROOM #123 EAST REST ROOM. |
| 04/05/2004 |
PLUMBING - ROUGH, SOIL |
|
Partial Approval |
IVRS - Inspection 0000*/ PRE SLAB WRAP FROM STOOL AREA IN 130. EAST AND NORTH THRU END OF BLDG AT 139, 140 |