09/23/2004 | FRAMING | Approved | IVRS - Inspection :* | |
09/09/2004 | FRAMING | Partial Approval | IVRS - Inspection :* | |
09/08/2004 | FRAMING | Partial Approval | IVRS - Inspection :*/CAT WALK FRAMING OK 1)PLASTIC REFRIDGERATOR WATER SUPPLY BOXES IN FIRE WALLS NEED TO BE SWITCHED OVER WITH METAL ONES |
|
09/01/2004 | FRAMING | Partial Approval | IVRS - Inspection :I AM REQUESTING THAT DESIGN ENGINEER OF RECORD INSPECT AND PROVIDE SEALED APPROVAL OF TRUSS SYSTEM AS INSTALLED AND REPAIRED | |
08/26/2004 | FRAMING | Partial Approval | IVRS - Inspection :W 1/2 4TH FLOOR OK TO ROCK WALLS W 1/2 3RD FLOOR OK FINISH REPAIRS ON HOLES IN CORRIDOR TRUSSES OFF BEARING BY 8" MAKE REPAIRS @ SE CORNER AS NOTED NAIL HANGERS @ LVL ALL FOSSET REPAIRS TO BE NAILED @ 2" O.C. #32 TRUSSES MISS BEARING POINTS @ EXTERIOR SOUTH WALL |
|
08/25/2004 | FRAMING | Not ready for Inspection | IVRS - Inspection :* | |
08/24/2004 | FRAMING | Partial Approval | IVRS - Inspection :*/PARTIAL 1) E 1/2 4TH FLOOR OK TO ROCK WALLS 2)CAP WITH ROCK OVER SHAFTS | |
08/23/2004 | FRAMING | Partial Approval | IVRS - Inspection :* | |
08/20/2004 | FRAMING | Not ready for Inspection | IVRS - Inspection :* | |
08/19/2004 | FRAMING | Partial Approval | IVRS - Inspection :3RD FLOOR READY TO INSULATE & ROCK CEILINGS FOOTING FOR 6' SCREEN WALL AROUND POOL OK PER PAG SPECS |
|
08/13/2004 | FRAMING | Partial Approval | IVRS - Inspection :3RD FLOOR - OK TO ROCK WALLS ONLY I NEED TO SEE ABOVE CEILING |
|
08/09/2004 | FRAMING | Not ready for Inspection | IVRS - Inspection :* | |
08/05/2004 | FRAMING | Cancelled | IVRS - AP canceled | |
08/05/2004 | FRAMING | Cancelled | IVRS - AP canceled | |
07/29/2004 | FRAMING | Cancelled | IVRS - AP canceled | |
07/28/2004 | FRAMING | Not ready for Inspection | IVRS - Inspection :*/ 1) YOU NEED TO COMPLETE AT LEAST 1/2 OF EACH FLOOR BEFORE CALLING INSPECTION-INCLUDING CORRIDOR | |
07/20/2004 | FRAMING | Partial Approval | IVRS - Inspection :1ST FLOOR OK ELEVATOR SHAFT OK OK TO ROCK ENTIRE 1ST FLOOR I WOULD LIKE TO SEE INSULATION WHEN BLOWN IN |
|
07/19/2004 | FRAMING | Not ready for Inspection | IVRS - Inspection :* | |
07/16/2004 | FRAMING | Cancelled | IVRS - AP canceled | |
07/09/2004 | FRAMING | Partial Approval | IVRS - Inspection :*OK TO ROCK EAST 1SR FLOOR WALL ONLY. | |
07/07/2004 | FRAMING | Partial Approval | IVRS - Inspection :* MAKE REPAIR @ #216 WHERE LIFT DAMAGE | |
07/06/2004 | FRAMING | Cancelled | IVRS - AP canceled | |
06/29/2004 | FRAMING | Partial Approval | IVRS - Inspection :*/ 1) 3RD FLOOR OK FOR ABOVE CEILING ROCK AND FOR CORRIDOR ROCK | |
06/28/2004 | FRAMING | Cancelled | IVRS - AP canceled | |
06/23/2004 | FRAMING | Partial Approval | IVRS - Inspection :*/ 1) CORRIDOR CEILING WEST UP TO ELEVATOR 2) ELECTRIC ROOM CEILING JOIST CHANGE | |
06/22/2004 | FRAMING | Cancelled | IVRS - AP canceled | |
06/16/2004 | FRAMING | Partial Approval | 1) 1ST FLOOR PROGRESS OK 2) PROVIDE FIRE BLOCKS 10' ON CENTER HORIZONTAL WHERE NOT CHANNEL OR 'Z' CHANNEL USED ON FRAMING | |
06/15/2004 | FRAMING | Cancelled | IVRS - AP canceled | |
06/09/2004 | FRAMING | Partial Approval | IVRS - Inspection :*/ 1) OK TO ROCK 2ND FLOOR CORRIDOR LIDS | |
06/08/2004 | FRAMING | Cancelled | IVRS - AP canceled | |
06/03/2004 | FRAMING | Partial Approval | IVRS - Inspection :* OK TO ROCK CORRIDORS LIDS & SIDES | |
05/25/2004 | FRAMING | Partial Approval | IVRS - Inspection :*/1) INTERIOR SW NOT FULLY BLOCKED-GET RFI | |
05/18/2004 | FRAMING | Partial Approval | IVRS - Inspection :*/ 1) SHEAR NAILING REQUIRED ALL EDGES. REPAIR BLOCKING AS NEEDED 2) USE METAL SHIMS WHERE HEADERS NOT CONTACTING TRIMMERS 3) SHEAR WALLS MORE THAN 1 UNIT PANEL IN HEIGHT REQUIRE STAGGERED JOINTS (S3.3) 4) HOW DOES ENGINEER WANT 2 X 10 LEDGERS FASTENED TO HALL WALLS ? (6/S3.2) | |