Inspection History Details
Inspection Status: Approved
Inspection History: BUILDING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/16/2004 | BUILDING - FINAL | Approved | IVRS - Inspection :*APPROVED | |
| 08/13/2004 | BUILDING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999*/ 1) HANDRAILS 34"-38" |
|
| 08/11/2004 | BUILDING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999*/ 1) INSTALL VACCUM BREAKER HOSE BIB 2) INSTALL 90 DEGREE ELBOW EXTERIOR WEST SIDE CONDENSATE 3) COMPLETE GRADING 4) REMOVE TAPE (USE SCREWS) FLUE PIPE TRANSITION DRAIN SINGLE TO DBL WALL H20 HEATER 5) INSTALL DRIP LEG GAS PIPING AT APPLIANCES 6) NO EXPOSED BULBS CLOSETS 7) NEED LADDER TO INSPECT ON ROOF 8) NEED INSULATION, STUCCO, AND SPECIAL INSPECTION CERTS 9) GARBAGE DISPOSAL/DISHWASHER TO BE ON APPROVED 20 AMP CIRCUIT 10) INSTALL VENT A/C CONDENSATE 11) HANDRAILS ARE TO BE BETWEEN 34"-38" 12) STOPPED INSPECTION |