Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
Permit Number - T03CM02226
Inspection Description - PLUMBING - ROUGH, SOIL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
02/26/2004 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection 0000*/1) EXTERIOR DRINK FOUNTAIN OK PER APPROVED PLAN CORRECTIONS TO PLANS ON SITE. CORRECTIONS MADE 2) 2-BACK FLOW CERTIFICATIONS 3) 1-BACTERIA REPORT FOR WATER SYSTEM. TURNED IN WITH FINAL | |
02/12/2004 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection 0000* | |
02/03/2004 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection 0000*/ WTR TEST OF GREASE INTERCEPTOR OK. | |
01/14/2004 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection 0000*/ 1) WATER TEST ON 4" PIPING FROM INSIDE BLDG TO GREASE TRAP ? AND TO TIE INTO BLDG DRAIN-OK. WILL NEED TO SEE CITY APPROVED PLAN FOR CHANGE TO PIPING, WATER TEST OF TRAP, WITH WRITTEN APPROVAL FOR SIDE ENTRY INTO GREASE TRAP | |
01/09/2004 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection 0000*/ H20 FOR DRINKING FOUNTAIN IS APPROVED. SANITARY DRAINAGE FOR DRINKING FOUNTAIN WILL REQUIRE CONNECTION TO SANITARY SEWER WITH CITY APPROVED PLAN. | |
01/06/2004 | PLUMBING - ROUGH, SOIL | Partial Approval | ADDITION OF MOP SINK - PARTIAL APP. | |
11/10/2003 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection 0000*/ 90 PSI AIR TEST ON 2" H2O SUPPLY FOR BLDG AND 1" FUTURE BACK OUT OF BLDG. OK. | |
11/04/2003 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection 0000*/ 1) PLEASE INSTALL END OF LINE 4" CLEAN OUT IN ALL RESTROOMS 2) PLEASE INSTALL IN LINE CLEAN OUT IN RUNS OVER 100' IN LENGTH 3) PLEASE INSTALL 2 WAY CLEAN OUT AT POINT OF BLDG DRAIN AND SEWER CONNECTION 4) PLEASE PROVIDE VERIFICATION OF ABS PIPING TO 5' OF EXTERIOR OF BLDG 5) PLEASE PROVIDE CITY APPROVED DRAWINGS FOR ADDITIONS TO ROUGH SOIL PIPING AND CHANGES TO EXISTING APPROVED PLAN |