Inspection History Details
Inspection Status: Approved
Inspection History: FRAMING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/06/2004 | FRAMING | Approved | IVRS - Inspection :* | |
| 10/01/2004 | FRAMING | Denied | IVRS - Inspection : See detailed listing on site.| 999*/ 1) BASE BOARD HEATER MUST BE ON DEDICATED HARD WIRED CIRCUIT 3) ALL WIRES MUST TERMINATE IN APPROVED ELECTRIC BOXES 4) DRYER CIRCUIT MUST BE 3 WIRE AND GROUNDED WITH 4 PRONG OUTLET 5) TRAP AND VENT LAUNDRY 6) REMOVE UNIONS FROM INSIDE WALL 7) PROVIDE ANTI-SCALD SHOWER VALVES 8) UNCOVER SHOWER DRAIN 9) DUCT VENT OUTSIDE 10) WOOD ? NOT ALLOWED |
|
| 06/11/2004 | FRAMING | Denied | IVRS - Inspection : See detailed listing on site.| 999* |