Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/13/2004 | ENGINEERING - FINAL | Approved | ||
| 02/06/2004 | ENGINEERING - FINAL | Partial Approval | TEMPORARY C OF O. 1. Place rock rip rap at each roof drain on the east side of building. 2. Complete 1-1/2" overlay on parking lot to the west. |