Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Permit: T03CM02055

Parcel: 141172570

Inspection Status: Approved

Inspection History: EXT METAL CLIPS/EXT SHEATHING

Date Description Inspector Results Comments
06/23/2003 EXT METAL CLIPS/EXT SHEATHING Approved IVRS - Inspection 0000*
06/10/2003 EXT METAL CLIPS/EXT SHEATHING Partial Approval IVRS - Inspection 0000*/ 1) NO HOLDOWNS REAR OF HOUSE NOT NAILED TO TWO KING STUDS REPLACE WILL CHECK AT INTERMEDIATES 2) CHECK OVERSPAN STUDS AT GARAGE AND NORTH WEST CORNER
06/06/2003 EXT METAL CLIPS/EXT SHEATHING Denied IVRS - Inspection 0999*/ 1) FRONT POP OUT NOT NAILED 2) NEED A.B. AT SOUTH SHOWER SPLICE IN B/PLATE 3) OSB TURNED THE WRONG WAY AT FRONT DOUBLE HIP TO VERTICAL WALL 4) WHAT SIZE NAIL WAS USED IN AHUGS-26-2 HANGER ? NEED HEADER SIZE GARAGE MAN DOOR 6) NEED TRUSS SHOP DRAWINGS 7) AT NEXT INSPECTION NEED IN WRITING STRUCTUAL INFO; FOR SHEAR TRANSFER AND A SET OF HEADER SIZES FOR ALL MODELS