Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: T03CM02039

Parcel: 10603167C

Inspection Status: Approved

Inspection History: PLUMBING - FINAL

Date Description Inspector Results Comments
12/17/2003 PLUMBING - FINAL Approved IVRS - Inspection 0000*/ 1) WTR DELETED AT DENTAL CHAIRS. 2) PLBG FINAL OK. 3) OK FOR C OF O PENDING ANY OTHER INSP.
12/02/2003 PLUMBING - FINAL Not ready for Inspection IVRS - Inspection 0000*/ 1) MOST CORRECTIONS HAVE BEEN MADE OK. SMU MECHANICAL IS AWARE OF DISCREPANCIES BETWEEN PLAN AND INSTALLATION AND ARE OK WITH IT. 2) CW TO DENTAL CHAIRS NOT COMPLETE. ANY CONNECTION TO POTABLE WATER MUST BE PROTECTED. PLEASE MAKE ALL CONNECTIONS FOR FINAL INSPECTION.
11/06/2003 PLUMBING - FINAL Not ready for Inspection IVRS - Inspection 0000*/ 1) P-9 KS NOT INSTALLED PER PLAN. 2 COMP, 4 HOLE WITH SPRAY AND BRASS TRAP. INSTALLED IS ONE COMP WITH SPRAY TIED UP UNDER SINK. ABS P'TRAP. 2) ALL CONDENSATE 1" AND LARGER CONNECTED TO 5/8" BRANCH TAILPIECE CONSIDERED OBTRUCTION OF FLOW. 3) 1-1/4" ED AT WHZ TO BE TIED INTO F.D. NOT SINK TAILPEICE. 4) CONDENSATE DRAIN AT P-9 NOT APPROVED. 5) COMP. AIR, CW, AND VACUUM AT DENTAL ASSIST INSTALLED WITHOUT INSPECTION. NEED TO SEE ALL PIPING AND CONNECTIONS TO EQUIPMENT AND CHAIRS. 6) ALL PLBG CONNECTIONS TO BE MADE ACCORING TO PLAN; IE: BRASS TRAPS, LOOSE KEY STOPS ETC. 7) TRAP PRIMER NOT ACCESSABLE BEHIND PANEL. 8) HAVE PLBR CHECK ALL WORK AND INSTALL PER PLAN.
11/04/2003 PLUMBING - FINAL Denied IVRS - Inspection 0999*/ 1) YOU HAVE BEEN GIVEN PERMISSION TO CONNECT A CONDENSATE DRAIN TO A SINK TAIL PIECE, PROVIDED THAT THE SINK IS USED PRIMARILY FOR HAND WASHING. YOU WERE NOT GIVEN PERMISSION TO CONNECT TO A BREAKROOM SINK. (P-9) SINKS ARE NOT APPROVED LOCATIONS FOR CONDENSATE WASTE WHEN DIRECTLY CONNECTED TO THE TAIL PIECE 2) PROVIDE APPROVED REVISION FOR PLUMBING AT DENTAL ASSIST. 3 FIXTURES ON 1/2" CU. WHO INSPECTED VACCUM PIPING ? COPPPER NOT SUPPORTED IN AN APPROVED METHOD. PIPING COVERED BEFORE INSPECTION PROVIDE DETAIL FOR DENTAL CHAIRS-IS BACKFLOW PROTECTION REQUIRED ?
10/29/2003 PLUMBING - FINAL Denied IVRS - Inspection 0999*/ 1) PROVIDE REVISED APPROVED PLAN FOR PLUMBING IN RENTAL ASSIST ROOM. 2) CAULK ALL FIXTURES. 3) INSTALL COUNTERSUNK TAPPED C.O. PLUGS WITH APP. SCREWS UNDER CHROME COVERS. 4) CONTRACTOR TO PAY RE-INSPECTION FEE. PLUMBER TO CHECK ALL WORK.
10/27/2003 PLUMBING - FINAL Not ready for Inspection IVRS - Inspection 0000*/ SEE SPEC. FOR INSULATION ON WATER LINE MP-1. CO MISSING AT SINK - PHARMACY. EXTEND PLUMBING VENTS AT ROOF - FROM FRESH AIR INTAKE, SEE CODE - CO AT DRINKING FOUNTAIN. CORRECTIONS HAVE NOT BEEN MADE ON CONDENSATE LINE. ALL FIXTURES TO BE INSTALLED AT TIME OF FINAL. PLEASE PROVIDE APPROVED DRAWING FOR DENT. RM. WATER STUB OUTS? THIS IS NOT A COMPLETE LIST.
10/24/2003 PLUMBING - FINAL Not ready for Inspection IVRS - Inspection 0000*/ HAVE PLUMBER WALK THRU AND CHECK ALL WORK PRIOR TO CALLING FINAL. ALL FINAL PLUMBING TO BE MADE READILY ACCESSABLE.
10/23/2003 PLUMBING - FINAL Not ready for Inspection IVRS - Inspection 0000*