Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/12/2003 | ENGINEERING - FINAL | Approved | ||
| 08/21/2003 | ENGINEERING - FINAL | Partial Approval | Provide revised site plan with engineering plan approval stamp. Provide drainage at the northwest side of building. Clean-up and remove all construction material and debris. | |
| 08/14/2003 | ENGINEERING - FINAL | Denied | 1. PROVIDE SIDEWALK AT SOUTHWEST SIDE OF SITE. 2. REMOVE EXISTING CONCRETE SLAB AT THE NORTHWEST SIDE OF THE SITE AS SHOWN ON THE SITE PLAN. 3. CLEAN-UP AND REMOVE ALL CONSTRUCTION MATERIAL AND DEBRIS. |