Permit: T03CM01922

Parcel: 117030290

Inspection Status: Approved

Inspection History: PLUMBING - ROUGH, SOIL

Permit Number - T03CM01922

Inspection Description - PLUMBING - ROUGH, SOIL

Inspection Status - Approved

Date Description Inspector Results Comments
08/06/2003 PLUMBING - ROUGH, SOIL Approved IVRS - Inspection 0000*
07/06/2003 PLUMBING - ROUGH, SOIL Denied IVRS - Inspection 0999* 1) MET WITH PLUMBER REVIEWD INSTALLATION STANDARDS 2) RECALL FOR INSPECTION.
07/02/2003 PLUMBING - ROUGH, SOIL Denied IVRS - Inspection 0999*/ 1) HAVE PLUMBER ON SITE AT TIME OF NEXT INSPECTION SO WE CAN REVIEW MINIMUM INSTALLATION STANDARDS, ACCEPTABLE PLUMBING INSTALLATION 2) STANDARD PRACTICES AND PROPER ANCHOR AND SUPPORTS
07/01/2003 PLUMBING - ROUGH, SOIL Denied IVRS - Inspection 0999*/ 1) HAVE PLUMBER REVIEW 708.0 94 UPC GRADE OF HORIZONTAL DRAINAGE PIPING. HORIZONTAL PIPING SHALL BE RUN IN PRACTICAL ALIGNMENT (NO COCKED FITTINGS) AT A UNIFORM SLOPE OF 2 PERCENT OR 1/4" PER FOOT SLOPE 2) ALL HORIZONTAL SECTION TO BE SUPPORTED 3) CLEAN OFF ALL NEW PIPING OF DEBRIS OR OTHER OBSTRUCTIONS FOR INSPECTION 4) COPPER PIPING TO BE TYPE "L". ALL HOT WATER TO BE INSTALLED AFTER INSPECTION. SUPPORT COPPER IN ACCORFANCE TO TABLE 3-1 -4 UPC 5) REMEMBER ALL WORK TO BE INSTALLED IN A WORKMANSHIP LIKE MANNER. NEATNESS COUNTS !
06/24/2003 PLUMBING - ROUGH, SOIL Not ready for Inspection IVRS - Inspection 0000*/ 1) NOT READY FOR INSPECTION
06/24/2003 PLUMBING - ROUGH, SOIL Denied IVRS - Inspection 0999*
06/16/2003 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection 0000*/ 1) CONTRACTOR TO ADD 03035 PLUMBING INTERMEDIATE TO PERMIT 2) 2ND FLOOR ABS DWV THRU ROOF-OK, STRAPPING UNDER FLOOR-OK. SUBJECT TO WATER TEST 3) TUBS OK 2ND FLOOR CLOSET FLANGES-OK AND 2ND FLOOR 4) COPPER OK AND FLOOR ONLY 5) OK TO COVER SECOND FLOOR