Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
Permit Number - T03CM01879
Inspection Description - PLUMBING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/11/2004 | PLUMBING - FINAL | Approved | IVRS - Inspection :*/ CORRECTION MADE/ 1 COPY OF PIMA CO. PROVISIONAL VERIFICATION OF GENERAL PERMIT CONFORMANCE. 3 BACKFLOW CERTS ALL EXTERIOR 1 FOR BLD 1 FOR FUTURE 1 FOR LANDSCAPE. | |
05/10/2004 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :*/ 1) NEED VERIFICATION OF GRADE STAMPED BY ENGINEER FOR MANHOLE #4 TO MANHOLE #5, COPIES OF BACKFLOW CERTIFICATIONS, PIMA CO. GENERAL PERMIT CONFORMANCE FOR SEWER. 2) NEED REACTIVATION OF PERMIT # T03PL01608 FOR SIGN OFF. | |
05/06/2004 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :*/ 1) PLEASE CALL IN AND HAVE APPROVED, ALL REQUIRED INSPECTIONS- I.E. 03055. 2) CLEAN OUTS IN DRIVE NOT COMPLETE. 3) DOES CONTRACTOR HAVE TEMP C OF O? | |
03/09/2004 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection 0000*/ NO PROBLEMS FOR TEMP C OF O. | |
02/26/2004 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection 0000* |