Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/31/2006 | ENGINEERING - FINAL | Approved | Contractor completed punch list. | |
| 01/19/2006 | ENGINEERING - FINAL | Denied | 1) PROVIDE POSITIVE DRAINAGE AWAY FROM BLDG. FLOW MUST FOLLOW THE FLOW LINE THAT IS SHOWN ON THE APPROVED SITE PLAN. 2) PROVIDE SPLASH BLOCKS AT ALL ROOF DOWN SPOUTS AS CALLED FOR IN THE APPROVED SITE PLAN. 3) COMPLETE EXTERIOR OVERHEAD WORK. 4) REMOVE EXCESS STOCKPILED SOIL AND MATERIAL FROM SITE. |