Permit: T03CM01878

Parcel: 11822097D


Addresses:

101 W 25TH ST

Inspection Status: Approved

Inspection History: ENGINEERING - FINAL

Date Description Inspector Results Comments
03/31/2006 ENGINEERING - FINAL Approved Contractor completed punch list.
01/19/2006 ENGINEERING - FINAL Denied 1) PROVIDE POSITIVE DRAINAGE AWAY FROM BLDG. FLOW MUST FOLLOW THE FLOW LINE THAT IS SHOWN ON THE APPROVED SITE PLAN.
2) PROVIDE SPLASH BLOCKS AT ALL ROOF DOWN SPOUTS AS CALLED FOR IN THE APPROVED SITE PLAN.
3) COMPLETE EXTERIOR OVERHEAD WORK.
4) REMOVE EXCESS STOCKPILED SOIL AND MATERIAL FROM SITE.