Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/17/2006 | ENGINEERING - FINAL | Approved | ||
| 03/31/2006 | ENGINEERING - FINAL | Denied | 1) STABILIZE DIRT LANDSCAPE AREAS AROUND BLDG. ANY SLOPE AT 2:1 OR GREATER REQ ROCK RIP RAP, ANY SLOPE AT 1:1 OR GREATER REQ GROUTED RIP RAP. 2) CLEAN OUT CATCH BASIN ON N. SIDE OF BLDG. STABILIZE AREA AROUND CATCH BASIN. 3) PROVIDE SPLASH BLOCKS FOR ROOF DRAINS. 4) PROVIDE SCUPPERS FOR THE TWO ROOF DRAINS LOCATED ON THE WEST SIDE OF BLDG WHERE THEY CROSS THE SIDE WALK. 5) PROVIDE FOR NATURAL RAIN WATER DRAINAGE FROM THE EAST OF THE NEW FACILITY AROUND BOTH THE N. AND S. AND PROCEED TO BLEND WITH EXISTING GRADES AT WEST. (SEE NOTE#3 ON PLANS) |