Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date |
Description |
Inspector |
Results |
Comments |
| 06/17/2003 |
PLUMBING - ROUGH, SOIL |
|
Approved |
IVRS - Inspection 0000* |
| 06/16/2003 |
PLUMBING - ROUGH, SOIL |
|
Denied |
IVRS - Inspection 0999*/ 1) PROVIDE 100 SQUARE INCHES HIGH AND LOW COMBUSTION AIR FOR WATER HEATER 2) GAS PRESSURE TEST MUST BE A MINIMUM OF 10 PSI OR HIGHER FOR TEST. LESS THAN 10 PSI NOW 3) PROVIDE 1" CLEARANCE FROM CLASS "B" VERT TO COMBUSTIBLE (ROOF) MATERIAL 4) PRVOIDE A 10' HIGH WATER TEST ON DRAIN WASTE AND VENT SYSTEM 5) WRAP ALL ABS PLUMBING THAT WILL CONTACT CONCRETE |