Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - TEMP POWER FOR TEST
Permit Number - T03CM01827
Inspection Description - ELECTRIC - TEMP POWER FOR TEST
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/14/2003 | ELECTRIC - TEMP POWER FOR TEST | Approved | IVRS - Inspection 0000* | |
10/25/2003 | ELECTRIC - TEMP POWER FOR TEST | Partial Approval | 1) SPOKE WITH DAVE MANN. HE GAVE TRIUMPH BUILDERS 30 DAYS TO INSTALL A PULL BOX. NO FUEL IS TO BE BROUGHT ON SITE UNTILL A CLEARACNE HAS BEEN RELEASED FOR FUEL. IF FUEL IS ON SITE BEFORE THIS TIME POWER WILL BE DISCONNECTED IMMEDIATELY. A FULL SEAL OFF INSPECTION WILL BE NEEDED FOR THIS CLEARANCE. 2) MAINTAIN 5 THREAD CONTACT AT ALL FITTINGS AND BOXES IN HAZARDOUS AREAS 3) SPLICE INSULATION TO BE EQUAL TO ORIGINAL THICKNESS 4) PROTECT CONDUCTORS #4 AND LARGER AT FITTINGS 5) UNDERGROUND CONDUITS ENTERING HAZARDOUS LOCATION NOT TO HAVE MORE THAN 360 DEGREE IN A RUN. IF A PULL BOX IS USED THEN SEAL OFFS WILL BE NEEDED AND LAST 24" TO ? TO BE RIGID STEEL CONDUIT. ARTICLE 514 6) ALL UNDERGROUND CONDUITS IN DRIVE ARFAS TO BE 24" BELOW GRADE AS PER 300.5. PROVIDE POT HOLES AS DISCUSSED 7) MAINTAIN 5' AROUND VENT FOR CLASS 1 DIV II LOCATION 8) FOR TEMP POWER FOR TESTING ALL DEVICES FOR POWER 8' AND BELOW TO BE SEALED, BLANKED, OR DEVICED-THIS WILL BE FOR TESTING ONLY. NO FUEL. NO STOCKING 9) PLEASE CHARGE TO APA ACCOUNT 10) OK TEMP POWER FOR TEST AS PER INSTRUCTIONS ABOVE | |
10/23/2003 | ELECTRIC - TEMP POWER FOR TEST | Denied | FINISH PREVIOUS INSPECTIONS AND INSTALLATION OF BREAKER. |