Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/22/2003 | ENGINEERING - FINAL | Approved | ||
| 10/17/2003 | ENGINEERING - FINAL | Partial Approval | TEMPORARY C OF O APPROVED. 1. PROVIDE PEDESTRIAN WALKWAY STRIPING AT SOUTHWEST CORNER OF WALGREENS BUILDING. 2. BEVEL CURB AT THE ENTRANCE AT THE SOUTHWEST CORNER OF THE PROJECT. 3. COMPLETE GRADE TO ALLOW DRAINAGE FROM PHASE 2 PORTION OF THE SITE TO DRAIN THRU 2' CURB CUT AT SOUTHEAST CORNER OF WALGREENS PARKING LOT. 4. PROVIDE BICYCLE PARKING AS SHOWN ON DEVELOPMENT PLAN. |
|
| 10/06/2003 | ENGINEERING - FINAL | Partial Approval | TEMPORARY C OF O APPROVED AT THIS TIME, FINAL NOT TO BE GIVEN UNTIL ALL GRADING ISSUES ON THIS SITE ARE COMPLETE AND APPROVED AND THE PERMIT IS ACCEPTED. |