Inspection Status: Approved
Inspection History: FRAMING
| Date |
Description |
Inspector |
Results |
Comments |
| 05/01/2003 |
FRAMING |
|
Approved |
IVRS - Inspection 0000*/ 1) OK TO BACK FILL |
| 04/25/2003 |
FRAMING |
|
Not ready for Inspection |
IVRS - Inspection 0000*/ 1) 10' WATER TEST REQUIRED ON WASTE SYSTEM 2) USE OF 3 X 2 COMBINATION FTG FOR LAVATORY TRAP ARM CONNECTION PUTS VENT LOCATION TO LOW. (USE 3 X 2 SAN-TEE INSTEAD) 3) IT APPEARS THAT YOU COULD 45 DEGREE INTO EXISTING CLAY PIPE AND ABANDON DIAGONAL CLAY UNDER NEW BATH 4) COMPLETE CONNECTIONS AT TUB-BOTH WATER AND WASTE 5) FRAMING CANNOT BE APPROVED UNTIL ALL INTERMEDIATE INSPECTIONS ARE PASSED |