Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: T03CM01647

Parcel: 120081970


Addresses:

225 W ILLINOIS ST

Inspection Status: Approved

Inspection History: ELECTRIC - INTERMEDIATE

Date Description Inspector Results Comments
02/05/2004 ELECTRIC - INTERMEDIATE Approved
11/20/2003 ELECTRIC - INTERMEDIATE Partial Approval IVRS - Inspection 0000*/ 1) NEED TO VERIFY IF NEW ROOF HEATERE IS GAS OR ELECTRIC 2) HAVE PLAN CHANGED FROM EVAPORATIVE COOLER TO AC/HEATER 3) COMPLETE A/C ELECTRIC TO UNIT AND GAS IF APPLICABLE 4) NEED WATER TEST DWV SYSTEM 5) HAVE PLAN CHANGED FROM 200 AMP PANEL TO 100 AMP EXISTING 6) DRYER 220 VOLT WIRING REQUIRED
10/28/2003 ELECTRIC - INTERMEDIATE Not ready for Inspection IVRS - Inspection 0000*
10/27/2003 ELECTRIC - INTERMEDIATE Denied IVRS - Inspection 0999*1) INSTALL A35'S LEDGER TO EACH STUD OR 3/8'' LOG BOLTS AT 24'' SPACING 2) COMPLETE ALL PLUMBING, ELECTRIC, MECH, GAS