Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/24/2004 | ENGINEERING - FINAL | Approved | ||
| 11/14/2003 | ENGINEERING - FINAL | Approved | C OF O APPROVED PER DAVE ROBERTS. CALL DAVE ROBERTS REGARDING APPROVAL OF FINAL GRADING INSPECTIONS FOR T99BU01249 AND T02BU01249. |
|
| 11/13/2003 | ENGINEERING - FINAL | Partial Approval | 1. Resubmit plans for revision on handicap parking and have stamped and approved. 2. Provide class-2 bicycle parking. 3. Repair asphault 4. Provide all striping for parking. 5. CLEAN-UP ALL CONSTRUCTION MATERIALS AND DEBRIS FROM DRAINAGE SWALE AT NORTHWEST CORNER OF THE BUILDING. 6. BARRICADE ALL AREAS WHERE CONSTRUCTION ACTIVITY IS OCCURRING TO PREVENT PEDESTRIAN ACCESS. 7. PROVIDED FILTER FABRIC AND ROCK RIP RAP AT ROOF DRAINAGE OUTLETS WEST OF BUILDING. |
|
| 10/15/2003 | ENGINEERING - FINAL | Partial Approval | Temporary CofO. 1. Resubmit plans for revision on handicap parking and have stamped and approved. 2. Provide class-2 bicycle parking. 3. Repair asphault 4. Provide all striping for parking. |
|
| 10/10/2003 | ENGINEERING - FINAL | Denied | C of O denied. Site not ready for inspection at this time. |