Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/03/2003 | ENGINEERING - FINAL | Approved | ||
| 12/03/2003 | ENGINEERING - FINAL | Approved | ||
| 11/17/2003 | ENGINEERING - FINAL | Partial Approval | TEMPORARY C OF O APPROVED. PERMANENT C OF O NOT TO BE GIVEN UNTIL THE FINAL GRADING INSPECTION #09190 IS COMPLETED AND APPROVED. 1. STRIPE PEDESTRIAN WALKWAY AT SOUTHWEST CORNER OF BUILDING. 2. REMOVE ALL SEDIMENT, DEBRIS AND CONSTRUCTION MATERIALS FROM DRAINAGEWAY ON NORTH SIDE OF PROJECT. |