Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 07/13/2004 |
PLUMBING - FINAL |
|
Approved |
APPROVED PER S. LONG ON 2:21 PM 7/13/04 |
| 07/12/2004 |
PLUMBING - FINAL |
|
Not ready for Inspection |
IVRS - Inspection :* |
| 07/09/2004 |
PLUMBING - FINAL |
|
Not ready for Inspection |
TEST ONLY ON DRAIN #1, 2 AND 3 PLEASE PROVIDE FLASHING ON ROOF DRAINS NO DETAIL ALSO NEED DETAIL ON TERMINATION OF 8" ROOF DRAINS HAVE BEEN DIRECTED TO WINTESS AIR TEST ONLY BY DAVE MANN-DRAIN COVERED AT THIS TIME |
| 07/07/2004 |
PLUMBING - FINAL |
|
Not ready for Inspection |
IVRS - Inspection :*/ 1) I HAVE BEEN DIRECTED BY DAVE MANN TO WITNESS AN AIR TEST ONLY ON ROOF DRAINS AND OVERFLOW DRAINS 2) ROOF DRAINS AND OVERFLOW DRAINS HAVE BEEN COVERED AT THIS TIME 3) PLEASE PROVIDE APPROVED PLAN ON JOB NEED TO SEE DETAIL FOR POINT OF TERMINATION |
| 06/30/2004 |
PLUMBING - FINAL |
|
Not ready for Inspection |
IVRS - Inspection :*/ 1) PROVIDE DOCUMENTATION FOR INTERMERDIATE AND ROOF DRAIN INSP. AND FINISH WORK FOR DRAINS FOR COOLER PER PLAN. 2) PROVIDE VACUUM BREAKER ON HOSE CONNECTION AT NEW COOLER WTR SUPPLY PIPING NOT SHOWN ON YOUR DRAWINGS. |