Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/13/2004 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :* | |
| 05/12/2004 | PLUMBING - ROUGH, SOIL | Denied | IVRS - Inspection : See detailed listing on site.| 999* |
|
| 05/07/2004 | PLUMBING - ROUGH, SOIL | Denied | IVRS - Inspection : See detailed listing on site.| 999*/ 1) CANNOT INSTALL FERNCO COUPLING WITHIN THE STRUCTURE. MUST USE A SPECIALTY COUPLING 2) CANNOT USE A SAN TEE FOR VERTICAL TO HORIZONTAL DRAINAGE. THIS FITTING MUST BE A DIRECTIONAL FITTING 3) MUST INSTALL WASTE AND VENT FOR MOP SINK IN CONVENTIONAL METHOD 4) MUST PAY FOR CONNECTION FEES FOR ADDED DRINKING FOUNTAIN 5) DRINKING FOUNTAIN REQUIRES A VENT 6) MUST RAISE C.O. AT WTR CLOSET FOR MIN. 18" OF CLEARANCE. 7) RE-TEST SYSTEM. |
|
| 04/29/2004 | PLUMBING - ROUGH, SOIL | Not ready for Inspection |