Inspection History Details
Inspection Status: Approved
Inspection History: BUILDING - TEMP POWER FOR TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/03/2003 | BUILDING - TEMP POWER FOR TEST | Approved | ||
| 03/25/2003 | BUILDING - TEMP POWER FOR TEST | Denied | IVRS - Inspection 0999*All new walls need to be opened up on one side. Treat inspections as if this was being built from the ground up. Refer to drawings to indicate the new walls. North wall (new) is not installed per code ( no footing and interior & exterior has been covered already) consult w/arch. on direction. need to refer to the last C of O Approved drawings to verify authenticity of existing walls verses new walls ( and exits) as indicated on these drawings. |