Inspection Status: Approved
Inspection History: EXCAVATION/LAYOUT REBAR & ZON
| Date |
Description |
Inspector |
Results |
Comments |
| 06/23/2005 |
EXCAVATION/LAYOUT REBAR & ZON |
|
Approved |
IVRS - Inspection :* |
| 06/29/2004 |
EXCAVATION/LAYOUT REBAR & ZON |
|
Not ready for Inspection |
IVRS - Inspection :*/ 1) 2" VTR REQUIRED FOR TOILET, VENT THE TRAP ARM NOT THE TRUNK LINE IN FLAT VENTING ROOL THE WYE, OR COMBO UP PAST THE ? OF HORIZONTAL TRUNK 2) LAV/NOT VENT CORRECTLY, YOU CAN USE A A/A VALVE 3) NEED 2 WAY CLEANOUT MAINTAIN 1/4" PER FT SLOPE ON DRAINAGE PIPE USE A FENCO BAND AT CLAY PIPE TO ABS 4) RAISE ALL REBAR ABOVE GRD 5) DOUBLE FOOTINGS 12" BELOW GRADE |
| 06/18/2004 |
EXCAVATION/LAYOUT REBAR & ZON |
|
Not ready for Inspection |
IVRS - Inspection :*/ 1) SHOWER DRAIN REQUIRES VENT 2) SAN-TEE NOT PERMITTED IN HORIZONTAL DRAINAGE 3) SINK DRAIN MUST CONNECT TO 3" WASTE DOWN STREAM OF TOILET VENT |
| 02/18/2004 |
EXCAVATION/LAYOUT REBAR & ZON |
|
Not ready for Inspection |
IVRS - Inspection 0000*/ 1) NO WATER IN PLUMBING FOR TEST |