Inspection Status: Approved
Inspection History: PLUMBING - SEWER HCS CONNECT
| Date |
Description |
Inspector |
Results |
Comments |
| 08/12/2003 |
PLUMBING - SEWER HCS CONNECT |
|
Approved |
IVRS - Inspection 0000*/ PVC HCS CONNECTION OK. OK TO COVER. |
| 08/11/2003 |
PLUMBING - SEWER HCS CONNECT |
|
Denied |
IVRS - Inspection 0999*/ 1) SOIL WATER TEST IS OK. 2) OK TO BACKFILL TRENCH. 3) MUST RED LINE APPROVED DRAWING SHOWING BLDG DRAIN EXIT OF BLDG. 4) MUST REMOVE C.O. TEE FOR TEST AND SPLICE IN A SOLID CONNECTION TO HCS. A WYE WITH PEEM CAP MAY BE USED FOR TESTING SYSTEM SEE SEC 316.1.2 94 UPC INSTALLATION STANDARDS. 5) DO NOT COVER HCS CONNECTION. |