Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: ROOF NAILING
| Date |
Description |
Inspector |
Results |
Comments |
| 04/08/2003 |
ROOF NAILING |
|
Approved |
IVRS - Inspection 0000* |
| 04/01/2003 |
ROOF NAILING |
|
Denied |
IVRS - Inspection 0999*/ 1) (SECTION A) AT EACH JOIST TO BEAM CALLS FOR METAL STRAP OVER RIDE 2) )SECTION B) BEAM IN POCKET BOTH SIDES CALLS FOR RED HEAD ANCHOR, USING METAL STRAPS NOT IN DETAIL 3) (SECTION A) 6 X 6 KING POST CALLS FOR 1/2" X 4" LAG OR THRU BOLTS 4) REVISE PLANS TO SHOW ASBUILT OR BUILD PER PLAN 5) PROVIDE A DETAIL FOR RIDGE BEAM TO RIDGE BEAM CONNECTION AT KING POST |