Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit: T03CM01018

Parcel: 110082180

Inspection Status: Approved

Inspection History: ROOF NAILING

Date Description Inspector Results Comments
04/08/2003 ROOF NAILING Approved IVRS - Inspection 0000*
04/01/2003 ROOF NAILING Denied IVRS - Inspection 0999*/ 1) (SECTION A) AT EACH JOIST TO BEAM CALLS FOR METAL STRAP OVER RIDE 2) )SECTION B) BEAM IN POCKET BOTH SIDES CALLS FOR RED HEAD ANCHOR, USING METAL STRAPS NOT IN DETAIL 3) (SECTION A) 6 X 6 KING POST CALLS FOR 1/2" X 4" LAG OR THRU BOLTS 4) REVISE PLANS TO SHOW ASBUILT OR BUILD PER PLAN 5) PROVIDE A DETAIL FOR RIDGE BEAM TO RIDGE BEAM CONNECTION AT KING POST