Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESS TEST FNL
| Date |
Description |
Inspector |
Results |
Comments |
| 11/28/2003 |
PLUMBING - GAS PRESS TEST FNL |
|
Approved |
IVRS - Inspection 0000* |
| 11/26/2003 |
PLUMBING - GAS PRESS TEST FNL |
|
Not ready for Inspection |
IVRS - Inspection 0000* |
| 10/31/2003 |
PLUMBING - GAS PRESS TEST FNL |
|
Partial Approval |
IVRS - Inspection 0000*/ 10 PSI TEST IS OK FROM METER LOCATION TO ROOF TOP UNITS. |
| 10/30/2003 |
PLUMBING - GAS PRESS TEST FNL |
|
Not ready for Inspection |
IVRS - Inspection 0000*/ 10 PSI TEST SHALL BE ON BOTH SYSTEMS. PLEASE SEE NOTE #2 FROM PREVIOUS INSP. |
| 09/09/2003 |
PLUMBING - GAS PRESS TEST FNL |
|
Partial Approval |
IVRS - Inspection 0000*/1) UNITS 1&2, 10 PSI PRESSURE TEST OK. 2) PLEASE CALL BACK AFTER METER DROP AND INSTALLATION OF GAS VALVES WITH CONNECTION TO METER AND ROOFTOP UNIT. 3) OK TO COVER NATURAL GAS PIPING. |