Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/14/2003 | PLUMBING - FINAL | Approved | IVRS - Inspection 0000*GAS PRESSURE TEST IS OK 2.) ALL CORRECTIONS HAVE BEEN MADE. |
|
| 02/28/2003 | PLUMBING - FINAL | Denied | IVRS - Inspection 0999* 1) MUST PROVIDE AIR TEST ON SYSTEM @ TIME OF INSPECTION. 2) MUST SCREW DOWN FLU VENT FOR WATER HEATER EVERY JOINT. 3) CAN NOT HAVE THREADED PIPE @ END OF P & T DRAIN. |
|
| 02/27/2003 | PLUMBING - FINAL | Denied | IVRS - Inspection 0999* 1.) MUST PROVIDE FLU VENT FOR WATER HTR WITH CAP AND (3) SHEET METAL SCREWS PRE JOINT. 2.) MUST EXTEND P & T DRAIN WITH CPVC AND TERMINATE 6" ABOVE GRADE. 3.) MUST PLACE WATER HTR ON SLAB OR BLOCKS 3" ABOVE GRADE. 4.) MUST PROVIDE FRESH AIR COMBUSTION FOR WATER HTR ENCLOSURE 2 10 X 10 GRILLS. 5.) MUST PROVIDE AGA OR CSA GAS SHUT OFF VALUES FOR ALL APPLIANCES. 6.) MUST REMOVE UNION IN HOUSE BY RANGE. 7.) MUST SCREW DOWN FLU VENT FOR FLOOR HTR. 8.) RE TEST SYSTEM 10LBS MIN. |