Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/21/2003 | ENGINEERING - FINAL | Approved | ||
| 07/02/2003 | ENGINEERING - FINAL | Partial Approval | TEMPORARY C OF O APPROVED AT THIS TIME UNTIL ALL WORK IS COMPLETE ON THIS SITE | |
| 06/27/2003 | ENGINEERING - FINAL | Denied | SITE IS NOT READY FOR INSPECTION. 1. REMOVE ALL CONSTRUCTION MATERIAL AND DEBRIS FROM THE SITE AND THE SOUTHEAST CORNER OF THE PARKING LOT. 2. CLEAN OUT THE STORMWATER SUMP AND REMOVE PORT-A-POT FROM DRAINAGE GRATE. 3. REPAIR CONCRETE SURFACE AT NORTH ENTRANCE. |
|
| 05/22/2003 | ENGINEERING - FINAL | Denied | COMPLETE ALL EXTERNAL WORK ADJACENT TO ALL PEDESTRIAN WALKWAYS PRIOR TO RESCHEDULING FOR THIS INSPECTION. |