Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
Permit Number - T03CM00974
Inspection Description - PLUMBING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/25/2003 | PLUMBING - FINAL | Approved | IVRS - Inspection 0000*1.) WILL REQUIRE LETTER FROM TUCSON WATER EXEMPTING BUSINESS FROM INSTALLING REDUCED PRESSURE BACKFLOW PREVENTERS. 2.) CONTRACTOR MAY DESIRE TEMP C OF O UNTIL RPPBP ISSUE IS RESOLVED. 3.) ALL PLUMBING IS COMPLETE THE ONLY ISSUE IS THE RPPBP. 4.) SEE STEVE LONG 791-5550 EXT 1147 OR 2ND FLOOR 201 N STONE DEVELOPMENT SERVICES. RE INSPECTED 3:00 PM. RPPBP WAIVED BY TUCSON WATER. OK FOR C OF O PENDING ANY OTHER INSPECTION. |
|
03/24/2003 | PLUMBING - FINAL | Denied | 1.) PROVIDE CERIFICATION FOR REDUCED PRESSURE BACKFLOW PREVENTER. 2.) ALL HOSE BIBBS TO HAVE ATMOSPHERIC VACUUM BREAKERS. 3.) CAULK ALL FIXTURES 4.) PROVIDE LETTER FROM ARCHETECT ALLOWING THREE FOOT PLUS WATER FLEX CONNECTOR TO WATER CLOSET. |