Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: FRAMING
Permit Number - T03CM00932
Inspection Description - FRAMING
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/21/2003 | FRAMING | Approved | IVRS - Inspection 0000* | |
11/06/2003 | FRAMING | Not ready for Inspection | IVRS - Inspection 0000*/ 1) AT FINAL, NEED TEMP GLASS WINDOW 1ST PANE DOOR, REAR 2) SEE BLACK MARKS ON FLOOR 3) TUB VERT BACKING SEE ALL TUBS FOR BACKING 4) PEX NOT APPROVED FOR TPR LINE 5) SHEET ROCK ABOVE KITCHEN, LOT OF WEIGHT BE CAREFUL 6) LTT 20 ON WRONG WALL 7) BLOCK AND SECURE WATER LINES AT WASHER TRAY | |
10/07/2003 | FRAMING | Not ready for Inspection | 1) 2ND FLOOR TUB FILL WITH WATER, NEED BACKING FOR DRYWALL SIDES AT DIVERTER 2) CHECK ALL PLUMBING FOR BANG PLATES 30 T & P LINES TO BE IN APPROVED MATERIAL 4) 2ND FLOOR BATH WATER LINES NICKED WITH LATH STAPLES, NAIL STILL STUCK IN ON LINE 5) REAR WINDOW 1ST FLOOR NEXT TO BACK DOOR TO BE SAFETY GLASS 6) 1ST FLOOR BATH, SECURE WATER LINES, BACKING A TUB SIDES 7) AT DRYER DEUCT WATER LINES OUT OF WALL, SECURE WATER LINES AT WASHER TRAY 8) FIRE BLOCK TOP/BOTTOM OF STAIR 9) TUB BACKING MASTER BATH |