Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
Permit Number - T03CM00900
Inspection Description - ENGINEERING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/12/2004 | ENGINEERING - FINAL | Approved | ||
01/09/2004 | ENGINEERING - FINAL | Approved | C OF O APPROVED. | |
11/07/2003 | ENGINEERING - FINAL | Partial Approval | TEMPORARY C OF O. 1. REFINISH PAVEMENT AT EDGE OF THE CATCH BASIN TO INCREASE FLOW INTO THE CATCH BASIN. 2. REFINISH PAVEMENT NEXT TO HANDICAP RAMP TO REDIRECT FLOW TOWARDS THE CATCH BASIN. |