Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/01/2004 | PLUMBING - INTERMEDIATE | Approved | IVRS - Inspection :*/ 1) SOIL WTR TEST IS OK. 2) WASTE AND VENT SYSTEM IS OK. 3) OVERHEAD WTR DISTRIBUTION IS OK. 4) GAS PRESSURE TEST IS OK. 5) NOTE: WILL REQUIRE A REVISED AND APPROVED PLAN ON WASTE AND VENT SYSTEN AND GAS SYSTEM PRIOR TO FINAL INSP. | |
| 06/30/2004 | PLUMBING - INTERMEDIATE | Denied | IVRS - Inspection : See detailed listing on site.| 999*/ 1) MUST PROVIDE AIR OR WTR TEST ON WASTE AND VENT SYSTEM. 2) MUST PROVIDE AN INSULATED SPACER FOR HOT AND COLD WTR SUPPLY AT TUB AND SHOWER. THESE LINES CAN NOT BE TOUCHING. 3) NOTE: MUST RED LINE DRAWING SHOWING REVISED GAS SYSTEM AND METER RELOCATION THEN HAVE RED LINED PLAN REDRAWN BY ARCHITECT THEN APPROVED BY PLANS EXAMINER PRIOR TO FINAL INSP. |
|
| 06/14/2004 | PLUMBING - INTERMEDIATE | Denied | IVRS - Inspection : See detailed listing on site.| 999*/ 1) NO APPROVED DRAWINGS ON SITE 2) DO NOT CALL FOR INSPECTION UNTIL YOU ARE 100 PERCENT READY 3) NO TEST ON SYSTEM |