Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/04/2004 | ENGINEERING - FINAL | Approved | ||
| 01/16/2004 | ENGINEERING - FINAL | Partial Approval | TEMPORARY C OF O. 1. FINAL C OF O NOT TO BE ISSUED UNTIL ROOF DRAINAGE ACROSS SIDEWALK ON THE N. SIDE OF BUILDING IS DISCUSSED WITH DSD ENGINEERING REVIEW. 2. PROVIDE SAND BAGS ONTOP OF SOIL TO PROTECT FROM ROOF DRAINS UNTIL OVERSEEDING IS PROVIDED IN APRIL. |