Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
Permit Number - T03CM00671
Inspection Description - ELECTRIC - FINAL
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/19/2003 | ELECTRIC - FINAL | Approved | IVRS - Inspection 0000* | |
| 11/14/2003 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection 0000* FINISH #2 ON PREVIOUS INSP | |
| 11/12/2003 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection 0000* 1) EMERGENCY LIGHT TO BE EFFECTIVE. 2) TIGHTEN FLEX & NIPPLE FITTINGS FOR NEON. 3a) INSTALL GTO CABLE FULLY INTO ELEC TO BIT CUP. 4) FURNISH POWER OUT TO MONUMENT & SIGN. | |
| 10/31/2003 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection 0000*/ 1) OK PHARMACY, TRAINING ROOM, BATHROOMS, BREAKROOM, STUCK ROOM-FINAL 2) OK TEMP C OF O TO STOCK ONLY SUBJECT TO DETERMINATION OF STEVE LONG 3) 1 CONDUCTOR PER SCREW IN PLUG MOLDS 4) CHECK CONNECTIONS TO FLOOR BOXES | |
| 10/29/2003 | ELECTRIC - FINAL | Not ready for Inspection | IVRS - Inspection 0000*/ 1) OK REFRIGERATION COOLERS, OK EAST WALL LIGHTING IN DISPLAY GONDULAS 2) USAGE OF CORD PER 400.7 AND 400.8 TO ALLOW ABILITY TO GONDULA-NOT ALLOWED FOR GONDULA POWER 3) SUPPORT FLEX CONDUIT AS PER CODES 3) APPROVED EXTENDER RINGS ARE NEEDED WHERE NOT FLUSH AT COMBUSTIBLES OR 1/4" AT NON COMBUSTIBLES. METAL NOT APPROVED 5) NEW DATA CANNOT LAY ON GRID 6) JUNCTION BOXES TO BE ACCESSIBLE | |
| 10/16/2003 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection 0000*/ 1) OK TEMP POWER FOR TEST 2) A LABEL STATING 1000 AMP FUSES ONLY HAS BEEN PLACED ON EQUIPMENT | |
| 10/14/2003 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection 0000*/ 1) COMPLETE #8 OF PREVIOUS INSPECTION-CHECK WITH MANUFACTURER. IF A NEW SWITCH OR LABEL IS CHANGED EQUIPMENT WILL NEED A FIELD EVALUATION LETTER SUBMITED BY 3RD PARTY TESTING 2) RECEIVED LETTER FOR TORQUE |