Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/07/2003 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection 0000* | |
| 05/06/2003 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection 0999* | |
| 04/30/2003 | PLUMBING - GAS PRESSURE TEST | Denied | 1.) SYSTEM REQUIRES 60# AIR TEST. 2.) GAS IS NOT INSTALLED PER APPROVED PLAN. IT IS VERY IMPORTANT TO HAVE AN ACCURATE GAS ISOMETRIC OR PLAN VIEW, SHOWING DEVELOPED LENGTH AND BTU CONSUMPTION OF ALL GAS APPLIANCES. ANY EXISTING GAS NOT BEING USED TO BE REMOVED. 3.) A UNION MAY NOT BE INSTALLED ABOVE THE T-BAR CEILING AT ANSUL VALVE. |