Permit: T03CM00413

Parcel: 141301910

Inspection Status: Approved

Inspection History: EXT METAL CLIPS/EXT SHEATHING

Permit Number - T03CM00413

Inspection Description - EXT METAL CLIPS/EXT SHEATHING

Inspection Status - Approved

Date Description Inspector Results Comments
03/27/2003 EXT METAL CLIPS/EXT SHEATHING Approved IVRS - Inspection 0000*/ 1) CHECK FLOOR SHEATHING MISSING SCREWS
03/26/2003 EXT METAL CLIPS/EXT SHEATHING Not ready for Inspection IVRS - Inspection 0000*/ 1) STILL WORKING ON ITEMS BELOW
03/25/2003 EXT METAL CLIPS/EXT SHEATHING Partial Approval IVRS - Inspection 0000*/ 1) TIE JOINT OF VAULTED ROOF TO GABLE 2) OK TO INSULATE
03/24/2003 EXT METAL CLIPS/EXT SHEATHING Not ready for Inspection IVRS - Inspection 0000*/ 1) SAME AS LAST INSPECTION DON'T LATH, NEED CONVERSION TABLE
03/21/2003 EXT METAL CLIPS/EXT SHEATHING Not ready for Inspection IVRS - Inspection 0000*/ 1) PANEL NOT GROUNDED 2) AT REAR SHEAR, NAIL BEHIND BALCONY FENCE AND RUN OSB UP TO UNDER SIDE OF SHEATHING 3) FRONT POPOUT, SECURE 2 X 4'S TO CORNERS DOUBLE STUD NAIL OFF HORIZONTAL 2 X 5 4) TRUSS ON 2ND FLOOR WITH DEEP SAW KERF 5) WAS JOINT AT TRUSS VAULTED TO GABLE STRAPED TOGETHER 6) ONE CORNER OF SHEAR AT FRONT DOESN'T TIE CORNER TOGETHER 2ND FLOOR
03/20/2003 EXT METAL CLIPS/EXT SHEATHING Denied IVRS - Inspection 0999*/ 1) FRONT WINDOW NOT COMPLETELY FRAMED 2) STRAP ALL CORNERS THAT ARE NOT CABIN TIED 3) NAIL ALL SHEER
03/18/2003 EXT METAL CLIPS/EXT SHEATHING Denied IVRS - Inspection 0950*/ 1) #950 WORK IS NOT COMPLETE ENOUGH TO INSPECT 2) #925 NO PLAN OR PERMIT ON SITE