Inspection Status: Approved
Inspection History: BUILDING - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 02/10/2004 |
BUILDING - FINAL |
|
Approved |
IVRS - Inspection 0000* |
| 02/09/2004 |
BUILDING - FINAL |
|
Not ready for Inspection |
IVRS - Inspection 0000* |
| 02/05/2004 |
BUILDING - FINAL |
|
Denied |
IVRS - Inspection 0999*/ 1) CORRECT BATH GFI'S 2) PROTECT NORTH KITCHEN COUNTER OUTLETS WITH GFI'S 3) HARD PIPE WATER HEATER TRP DRAIN (NO FLEX) AND WIRE FOR OPERATION 4) INTER-CONNECT SMOKIES 5) HEAT PUMPS ARE OVER FUSED-30 MAX 6) NEED BACK FLOW VALVE ON HOSE BIB 7) 1ST FLOOR PANEL-MATCH WIRE SIZE TO BREAKERS AND INSTALL BUSHING IN PANEL BOTTOM KNOCKOUT 8) 2ND FLOOR PANEL-CHANGE WATER HEATER TO 30 AMP DOUBLE POLE 9) TOP STAIR RISER IS 1 1/4" HIGHER THAN THE REST |