Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
Permit Number - T03CM00345
Inspection Description - ENGINEERING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/11/2003 | ENGINEERING - FINAL | Approved | ||
03/06/2003 | ENGINEERING - FINAL | Partial Approval | TEMPORARY C OF O APPROVED. FINAL C OF O NOT TO BE ISSUED UNTIL: 1. A DRAINAGE ASSURANCE REPORT IS SUBMITTED AND APPROVED BY CITY OF TUCSON DEVELOPMENT SERVICES, ENGINEERING SECTION. 2. AN APPROVED DRAINAGE SYSYSEM IS INSTALLED FOR CAR WASHING AND DETAIL OPERATIONS. |
|
02/18/2003 | ENGINEERING - FINAL | Partial Approval | APPROVED FOR TEMPORARY C OF O. RETENTION BASIN MUST BE REVITALIZED. RETENTION BASIN IS HOLDING WATER MORE THAN 24 HOURS AFTER RAINFALL. ONLY STORMWATER RUNOFF SHOULD BE ALLOWED INTO BASIN. |